The Dredge Report | Week of June 27, 2021

The Dredge Report | Week of June 27, 2021

By on July 19, 2021 in Dredge Updates, Recent News

Sand Shifter – Saquatucket Harbor Approach Channel, Harwich The first two days of the week once again brought about windy conditions and seas making it unsafe to bring the Sand Shifter back out to the channel and continue dredging. Dredging did resume on Wednesday and on Thursday (July 1) the project was completed ending the County […]

Continue Reading »

The Dredge Report | Week of June 20, 2021

The Dredge Report | Week of June 20, 2021

By on July 2, 2021 in Dredge Updates, Recent News

Sand Shifter – Saquatucket Harbor Channel, Harwich There was no dredging on Monday & Tuesday due to the strong wind & seas out of the Southwest. With the Red River Beach discharge completed (requiring 5,500 feet of pipe), we now had to remove approximately 1,500 feet of pipe as the distance to the discharge locations are […]

Continue Reading »

The Dredge Report | Week of June 13, 2021

The Dredge Report | Week of June 13, 2021

By on June 25, 2021 in Dredge Updates, Recent News

Sand Shifter – Saquatucket Harbor Channel, Harwich With the Allen Harbor project completed, the second and last project for Harwich is Saquatucket Harbor. This is also our last project of the season. This harbor is a very important recreational and commercial port for Harwich, as well as for all of Cape Cod as thousands of […]

Continue Reading »

The Dredge Report | Week of June 6, 2021

The Dredge Report | Week of June 6, 2021

By on June 22, 2021 in Dredge Updates, Recent News

Sand Shifter – Allen Harbor Channel, Harwich Dredging continued from Monday through Wednesday with the sand discharge moving to several beach locations along the shore. On Thursday, the team ~600′ of pipe from Aunt Lydia’s Cove and Harding’s Beach to Harwich that will be needed for several upcoming disposal locations requiring longer pipe lengths. Dredging continued […]

Continue Reading »

The Dredge Report | Week of May 30, 2021

The Dredge Report | Week of May 30, 2021

By on June 11, 2021 in Dredge Archives, Recent News

Sand Shifter – Allen Harbor Channel, Harwich Dredging started on June 1st with the Sand Shifter working just outside of the east breakwater in the entrance to Allen Harbor. There are several discharge locations designated by the town of Harwich including Grey Neck Beach and several private residences. Dredging continued throughout the week up until Saturday […]

Continue Reading »

The Dredge Report | Week of May 23, 2021

The Dredge Report | Week of May 23, 2021

Sand Shifter – Allen Harbor Channel, Harwich The dredge Sand Shifter, the pushboat Stephen S. Bradbury, and 5,000′ of pipe were moved from Aunt Lydia’s Cove, Chatham to Harwich on Thursday with the assistance of Chatham’s Harbormaster Stuart Smith and Harwich Harbormaster John Rendon of Harwich to get setup for the next project in the Allen […]

Continue Reading »

The Dredge Report | Week of May 16 , 2021

The Dredge Report | Week of May 16 , 2021

Cod Fish II – Bourne’s, Great & Green Pond Entrance Channels, Falmouth Last week all three projects in Falmouth were completed. On Tuesday, Bourne’s Pond Entrance Channel was completed. The volume target was 4,084 Cubic Yards. On Thursday, Great Pond Entrance Channel was started and completed. The volume target was 265 Cubic Yards. And on Friday, […]

Continue Reading »

The Dredge Report | Week of May 9, 2021

The Dredge Report | Week of May 9, 2021

Sand Shifter – Aunt Lydia’s Cove, Chatham Dredging was completed on Friday, May 14th which was a day ahead of schedule for this most important project for the town of Chatham. The days to follow will include work on removing the pipe from the discharge area (south of Minister’s Point) and preparations for moving the Sand […]

Continue Reading »

The Dredge Report | Week of May 2, 2021

The Dredge Report | Week of May 2, 2021

Sand Shifter – Aunt Lydia’s Cove, Chatham                 Work continued on the staging for Phase 2 of the Aunt Lydia’s Cove project. On Monday & Tuesday, the crew continued to move pipe to the discharge location along the beach just south of Minister’s Point. Dredging started on Wednesday and […]

Continue Reading »

The Dredge Report | Week of April 25, 2021

The Dredge Report | Week of April 25, 2021

Cod Fish II – Popponesset Bay, Mashpee Dredging continued on Monday even with strong wind and seas slowing down the operation. On Tuesday the dredging was completed for the Popponesset Bay Approach Channel. The pipe running from the dredge to the discharge location on the beach was removed and brought into the bay on Thursday along […]

Continue Reading »